We offer new ideas and technologies for greater efficiency, productivity and outreach for commercial, residential, industrial and military in camps and austere environments.

  • Standby Diesel Generators for ATS & SWCC Stations | 2.85MW | EPC

    Client: Saline Water Conversion Corporation (SWCC)

    Location: 12 Different Location Central and East Regions

    Dates: 2021-2022

    Services: EPC Turnkey Services

    Status: Completed and Energized

    Engineering, Procurement and Construction (EPC) of 12 standby generators, each with a different capacity. Installed for Saline Water Converstion Corporation (SWCC) at different pump stations in central and east regions of Saudi Arabia.

  • NCV-2 Hybrid Power Plant | 18 MW | EPC

    Client: Saudi Arabian Trading & Construction Company (SATCO)

    Location: NEOM Construction Vilage-2, NEOM, KSA

    Dates: 2021-2022

    Services: EPC Turnkey Services

    Status: Completed and Energized

    Engineering, Procurement and Construction (EPC) of the NCV-2, Hybrid Power Plant, in NEOM, KSA, with a total power of 18 MW; combining a 4.5MWp Solar system, 14MW diesel generators and 200kWh energy storage system operated by one hybrid controller system (Micro-Grid SCADA). The project was delivered within budget and ahead of time.

  • Tamimi Camp Hybrid Power Plant | 5.5 MW | EPC

    Client: Energy Rental Company (ENERCO)

    Location: NEOM Construction Vilage, Tamimi Camp, NEOM, KSA

    Dates: 2021-2022

    Services: EPC Turnkey Services

    Status: Completed and Energized

    Engineering, Procurement and Construction (EPC) of solar power plant (5.5MWp), integrating it to an existing 26MW diesel power Plant. The solar and generators were successfully connected through a hybrid controller system (Micro-Grid SCADA) for NEOM Construction Village - Tamimi camp.

  • OXAGON Power Plant | 5 MW | EPC

    Saudi Arabian Trading & Construction Company (SATCO)

    Client: Saudi Arabian Trading & Construction Company (SATCO)

    Location: OXAGON Camp, NEOM, KSA

    Dates: 2023-2024

    Services: EPC Turnkey Services

    Status: Completed and Energized

    Engineering, Procurement and Construction (EPC) of a complete diesel power plant (5MW), a hybrid controller system (Micro-Grid SCADA) was also installed and commissioned.

  • Shouibah 3 Solar Power Plant | 65 MW | EPC

    Client: Doosan and ACWA Power

    Location: Shouibah RO Plant, Shouibah, KSA

    Dates: 2023-2025

    Services: EPC Turnkey Services and O&M Services

    Status: Completed and Energized

    Engineering, Procurement and Construction (EPC) of 65MWp Solar power plant for Shuaibah 3 desalination plant. The project scope includes all civil activities, a 13.8kV switchgear, outgoing feeder and interconnection to the RO plant existing switchgear. A cyber secure SCADA system, interface with RO plant DCS system, HCIS class 4 security fence and a robotic cleaning system. LBPKSA also is responsible for the O&M of the plant. KPIs: 115,000 MWh/yr and 90,000 CO₂ offset/yr.

  • NRC25 Hybrid Power Plant | 22.5 MW | EPC

    Client: Mounes Mohammed AlShayeb Civil Works Company (MOBCO)

    Location: NEOM Residential City-25, NEOM, KSA

    Dates: 2024-2025

    Services: EPC Turnkey Services

    Status: Completed and Energized

    Engineering, Procurement, and Construction (EPC) of 22.5MW hybrid power plant; combining 16 x 1.125 MW diesel generators and 4.5MWp solar system for NRC25.

    The power plant was equipped with a state-of-the-art hybrid main controller and monitor.

    The power plant supports a camp for 10,000+ residents.

  • FCO Power Plant | 14.6 MW | EPC

    Client: Saudi Arabian Trading & Construction Company (SATCO)

    Location: Future City One, NEOM, KSA

    Dates: 2024-2025

    Services: EPC Turnkey Services

    Status: Completed and Energized

    Engineering, Procurement, and Construction (EPC) of a 14.6 MW diesel power plant (13 x 1.125 MW DGs) for Future Cities One NEOM Construction Village. Equipped with a 33KV switchgear. The project includes an energy management system for the plant and Micro-Grid SCADA.

  • O&M of NRC25 Hybrid Power Plant | 22 MW | EPC

    Client: Qantara Development

    Location: NEOM Residential City-25, NEOM, KSA

    Dates: 2024-present

    Services: O&M Services

    Status: 1+ years Ongoing

    Operation & Maintenance (O&M) of 22.5MW hybrid power plant; composed of 16 x 1.125 MW diesel generators and 4.5MWp solar system for NRC25.

    Delivering an availability of +99%.